Emergency plan for flood control of photovoltaic power stations

By huanggs
Accident classification: natural disaster accident, equipment accident, system voltage loss accident, personal injury accident. Natural disaster accident For emergency work, such as prevention of natural disasters and accidents, flood control and disaster relief, we should clarify our respective responsibilities, clarify key points and pay close attention to weak links to ensure that photovoltaic power stations are not damaged by floods and strong winds, ensure normal power supply, reduce disaster losses, protect national property and personal safety of employees, and maintain stability. Equipment accident During emergency handling, ensure that the safety of the human body and the power grid is not threatened. At the same time, eliminate the root cause of the accident as soon as possible, limit the development of the accident, and prevent and minimize the damage to the equipment. System voltage loss accident The system voltage loss may lead to the failure of the photovoltaic power station to connect to the grid. If the photovoltaic power station has not been identified, and personal safety is not threatened, the grid-connection switch should be disconnected to prevent the equipment failure of the power grid and solar cable 4mm2 back power, to ensure the safe operation of the power grid. Personal injury accident Emergency handling of accidents adheres to the principle of people-oriented, combining defense and rescue. In the event of unexpected injury emergencies, it takes the prediction and prevention of critical events as the basis, the quick and accurate handling of critical events as the focus, and the core is to ensure personal safety with all efforts. Emergency response organization First, emergency agencies and responsibilities 1. The operation personnel shall be trained in special operation (electrician operation) and electrician network operation and have passed the examination to obtain the corresponding qualification. At the same time, they shall be trained in electrocution first aid and have passed the examination. After the accident, should ensure the personal safety of the ambulance personnel under the premise of the rescued quickly out of the source of danger, and then report the relevant situation to the superior. The accident site shall be directed by the person on duty, and the accident handling power shall not be handed over until the superior leader arrives at the scene. After the accident happens, the company shall report the situation to the company leader and the supervisor in time. 2. The maintenance work of photovoltaic power station equipment and the safety measures on the site of the equipment must comply with the relevant requirements of the State Grid Corporation Electric Power Safety Working Regulations and the Safety Working Regulations of Electric Power Construction (DL5009). 3. Carefully analyze the site danger points and take various safety measures according to the equipment maintenance and switching operation. Periodically conduct hazard point analysis and check the completion of this work to ensure its pertinency and effectiveness. 4. Before carrying out equipment maintenance and switching operation, "three safety checks" should be carefully organized. 5. According to the work content and site conditions, make appropriate safety measures and danger point analysis report. 6. Handle the permit, guardianship, discontinuance, transfer and termination of the work ticket according to the work ticket system in the Work Safety Regulations of the State Grid Company. 7. Conscientiously carry out standardized management and standardized operations. 8. The operator of the photovoltaic power station shall earnestly implement the switching operation system in the "State Grid Corporation's Power Safety Working Regulations". 9. Set up safety warning signs and take reliable protective measures at the site where personal injury accidents may occur. 10. Operation personnel should correctly use safety equipment such as safety helmet, safety belt and protective suit before patrol maintenance and switch down operation. 11. Fire prevention, anti-virus, explosion-proof, dust-proof, anti-static, anti-induction and other measures should be adequately prepared. 12. The name and number of the on-site equipment should be clear and correct, and the double name of the equipment should be carefully checked before maintenance and switch down operation to prevent accidental and incorrect boarding of the live interval. 13. The photovoltaic power station regularly conducts safety procedures, systems and technology training for employees, so that they can master the relevant safety measures and requirements, clarify their safety responsibilities, and improve the ability and level of safety protection. For the current staff, safety technology training must be strengthened. After the "three-level safety training", they must prove that they have the necessary safety skills, and they can carry out maintenance work and switch back operation under the leadership of the experienced staff. It is prohibited to assign fresh recruits to dangerous work alone without supervision. 14. Various forms of safety ideology education should be carried out regularly according to the actual production, so as to improve the safety protection awareness of employees, master the knowledge of safety protection and self-rescue and mutual rescue methods in case of injury accidents. 15. Multi-level anti-accident exercises should be actively carried out to improve the overall actual combat level of the team and the individual combat ability of the staff. 16. Targeted technical training and technical competition activities should be carried out to improve the production skills of operators. 17. Strengthen the management of safety appliances. 18. Conscientiously implement various organizational and technical measures for production safety, equip sufficient safety instruments and protective equipment that have passed testing, resolutely eliminate unqualified instruments and protective equipment, and improve the safety guarantee level of equipment maintenance and switching operation. 19. Inspect, use, keep, store, inspect and test the safety appliances in accordance with the Regulations on the Administration of Safety Appliances of the State Grid Corporation. Conditions for the start of the plan 1. In the process of production and infrastructure construction of photovoltaic power station, in case of serious personal injury (requiring hospitalization) or above personal injury due to electric shock, high fall, object hit, mechanical injury, burning, traffic, natural disaster and other reasons, this plan can be activated. 2. The Company shall set up an emergency team and determine whether to enter an emergency state according to the situation, severity, possible consequences and the need for emergency treatment. After the decision is made to start the emergency treatment mechanism of the photovoltaic power station, the leader of the emergency leading group shall declare the emergency state, start this plan and report it to the emergency headquarters of the company. 3. The photovoltaic power station emergency team shall immediately carry out emergency treatment according to the plan and the division of responsibilities. 4. Establish a personal injury emergency rescue team. 5. The leader of the photovoltaic power station emergency team shall organize, direct and coordinate the personnel to enter the emergency rescue state; organize the collection of accident related materials (such as taking photos or videos, checking relevant records, items related to the accident, etc.) and investigate the cause of the accident. Supervise the safety measures at the rescue site to prevent personal injury to rescue personnel. Responsible for organizing on-site security work, protecting the original appearance of the scene and maintaining the scene order. Investigate the causes of non-productive accidents, collect and keep relevant data and material evidence. For non-productive incidents, timely measures should be taken to prevent further development and expansion of the situation, and local public security and fire control departments should be requested for support when necessary. 6. Members of the photovoltaic power station emergency team shall be responsible for the specific command of on-site emergency rescue under the command of the team leader, and assist the team leader in organizing the analysis and evaluation of the causes and severity of personal injuries; and timely contact with the hospital, request hospital medical staff support; organize the late disposal after the emergency situation is over. 7. Safety personnel of photovoltaic power station shall supervise the whole process of on-site rescue work and participate in the revision and improvement of the plan; responsible for the whole process of safety supervision of the rescue site, to prevent the rescue personnel from being hurt; if necessary, contact 120 Emergency Center or additional nearby hospitals for support. And perform the duty of reporting in accordance with the major events reporting system. To organize the injured personnel to carry out disability examinations and report the injury to the labor department; assist in collecting accident related data; responsible for video and photo taking of the accident site. Participate in the late disposal after the end of the emergency situation. 8. The spare parts manager of the photovoltaic power station is responsible for the reserve and supply of various emergency materials and participates in the late disposal after the emergency. 9. Additional personnel of the photovoltaic power station shall obey the command of the emergency working group and take an active part in the emergency treatment and aftermath.